Lowestoft Gullwing Bridge

LEC Marine (Klyne) Ltd are immensely proud to have been involved with the MEICA electrical installation for Lowestoft’s third river crossing the “Gullwing Bridge” hydraulic and control systems.

The Gullwing Bridge MEICA (Mechanical, Electrical, Instrumentation, Control & Automation) contract was awarded to OILGEAR Towler Ltd who were contracted with the design, manufacture and installation of the Gullwing Bridge various hydraulic power systems, hydraulic pump VSD switchboards, various control & monitoring systems, main power switchboards, emergency switchboard, emergency power generation and various vehicle & river traffic control systems.

OILGEAR Towler Ltd is a company already well known to LEC Marine (Klyne) Ltd, as both companies have worked closely together on other river road traffic bridge installations in the past. This being the case, it was not too long before we started discussing how we may be able to assist OILGEAR Towler Ltd with their onsite cabling and containment requirements for the various Gullwing project hydraulic and control systems.

Working closely with OILGEAR Towler Ltd, we started the MEICA cabling and containment installation in October 2023. The installation involved the supply of power & control cables, cable containment materials, cable termination materials & various other materials as required.

All cabling installed & connected strictly in accordance with OILGEAR Towler Ltd electrical schematic & connection drawings. Each cable installation being meticulously checked & tested on completion of its termination, against the supplied drawings etc.